




1. Mechanical seal: Excellent seal performance, reusable. Protection grade is IP68.
2. Installation method: Wall-mounted, pole-mounting, manhole
3. L× W× H: 280× 200× 90MM
4. Cable ports: 2-4 ports
5. Cable Diameter: Max φ 14
6. Max. Capacity (bunchy fiber): 96
7. Core capacity per tray: 12 or 24
Item | Parameters | |
1 | L×W×H | 280×200×90MM |
2 | Cable port | 2-4 ports |
3 | Cable Diameter | Max φ14 |
4 | Max.Capacity (bunchy fiber) | 96 |
5 | Core capacity per tray | 12 or 24 Holds up to 96 fibers |
6 | Box material | Modified polymer plastic |
Outside dimension (LxWxH) | 460×182×120 (mm) |
Weight (excluding outside box) | 2300g-2500g |
Number of inlet/outlet ports | 2 (pieces) on each side (total 4 pieces) |
Diameter of fiber cable | Φ5-Φ20 (mm) |
Capacity of FOSC | Bunchy: 12-96(Cores) |
2.2 Main components
No. | Name of components | Quantity | Usage | Remarks | |
1 | Housing | 1 set | Protecting fiber cable splices in whole | Internal diameter: | |
2 | Fiber optic splice tray | max. 4 pcs (bunchy) | Fixing heat shrinkable protective sleeve and holding fibers | Suitable for: | |
3 | Foundation | 1 set | Fixing reinforced core of fiber- cable and FOST |
| |
4 | Seal fitting | 1 set | Sealing between FOSC cover and FOSC bottom |
| |
5 | Port plug | 4 pieces | Sealing empty ports |
| |
6 | Earthing deriving device | 1 set | Deriving metallic components of fiber cable in FOSC for earthing connection | Configuration as per requirement | |
2.3 Main accessories and special tools
No. | Name of accessories | Quantity | Usage | Remarks |
1 | Heat shrinkable protective sleeve |
| Protecting fiber splices | Configuration as per capacity |
2 | Nylon tie |
| Fixing fiber with protective coat | Configuration as per capacity |
3 | Insulation tape | 1 roll | Enlarging diameter of fiber cable for easy fixing |
|
4 | Seal tape | 1 roll | Enlarging diameter of fiber cable which fits in with seal fitting | Configuration as per specification |
5 | Hanging hook | 1 set | For aerial use |
|
6 | Earthing wire | 1 piece | Putting through between earthing devices | Configuration as per requirement |
7 | Abrasive cloth | 1 piece | Scratching fiber cable |
|
8 | Labeling paper | 1 piece | Labeling fiber |
|
9 | Special wrench | 2 pieces | Fixing bolts, tightening nut of reinforced core |
|
10 | Buffer tube | 1 piece | Hitched to fibers and fixed with FOST, managing buffer | Configuration as per requirement |
11 | Desiccant | 1 bag | Put into FOSC before sealing for desiccating air. | Configuration as per requirement |
3. Necessary tools for installation
3.1 Supplementary materials (to be provided by operator)
Name of materials | Usage |
Scotch tape | Labeling, temporarily fixing |
Ethyl alcohol | Cleaning |
Gauze | Cleaning |
3.2 Special tools (to be provided by operator)
Name of tools | Usage |
Fiber cutter | Cutting off fibers |
Fiber stripper | Strip off protective coat of fiber cable |
Combo tools | Assembling FOSC |






Q1: How can i get your catalogue and price list?
A1: Please let us know your email or contactus from website directly for our catalogue and price list
Q2: Can I negotiate the prices?
A2: Yes, we may consider discounts formultiple container load of mixed goods
Q3: How much will the shipping charges be?
A3: It depends on the size of your shipment and the method of shipping. We will offer the charge to you as you requested
Q4: Can I visit you?
A4: Sure, our factory is in Qingdao, China. Please contact us to make an appointment
Q5: What if there is quality problem when we get the goods?
A5: If there is quanlity problem when you un-package the goods, you can take pictures for our reference, our QC department will check the problem and give best solutions to you, Further-more we will also take action to improve the quality in future
Q6. What is your terms of packing?
A6: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent
Q7. What is your terms of payment?
A7: T/T 30% as deposit, and 70% before delivery.We"ll show you the photos of the products and packages before you pay the balance
Q8. What is your terms of delivery?
A8: EXW, FOB, CFR, CIF, DDU
Q9. How about your delivery time?
A9: Generally, it will take 5-7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order
Q10. Can you produce according to the samples?
A10: Yes, we can produce by your samples or technical drawings